We design and install protection for warehouses, logistics and pharmaceutical centres: large roofs, refrigeration equipment, warehouse management systems and CCTV.
Trusted by logistics operators
Facilities where RAIDEN carried out lightning protection and earthing work.
Industry challenges and RAIDEN engineering solutions
A warehouse is stopped not by fire but by burnt-out automation: the WMS server, gates, refrigerators and cameras.
Large roof areas
Flat roofs with hundreds of metres of parapet and roof lights.
Refrigeration equipment
Chillers and condensers on the roof are exposed to direct strikes.
Warehouse automation
WMS servers, scanners, gates and docks are sensitive to surges.
Perimeter CCTV
Cameras on masts and facades pick up induced surges.
Pharmaceutical requirements
Medicine warehouses need climate systems that never stop.
Earthing
Large sites with asphalt and access roads.
How we work
From survey to handover with test reports — one team is responsible for the whole cycle.
Survey
A site visit or a review of your project and documents.
Design
Protection zone and risk calculation to DSTU EN 62305, bill of materials.
Installation
Installation by the RAIDEN team, equipment from our own stock.
Testing and handover
Test reports, as-built documentation, 10-year warranty.
We will review your project and show where you can save
Send your project or estimate — RAIDEN engineers will check the design, remove what is excessive and propose a code-compliant alternative with the same level of protection.
What you get
An engineer's opinion on the project or estimate: what to keep, what to replace with a code-compliant solution and where savings are possible.
Check my projectCompleted projects: logistics centres
4 RAIDEN projects. Click to see photos and a description of the work.
Let's discuss your facility
Send us your project, specification or photos of the facility — a manager will check the details and pass them to our engineers. No registration or long forms.



