What a lightning protection and earthing system inspection is

Short answer: an inspection is a comprehensive assessment of the system as it actually exists at the facility, its available documentation and accessible electrical parameters. It identifies defects, risks and action priorities. It is not limited to photographs or a single earth resistance measurement.

RAIDEN inspects new and existing lightning protection, earthing and equipotential bonding systems. The exact scope is agreed before the visit because buildings, documentation and access conditions differ.

When an inspection is needed

  • after installation by another contractor and before acceptance;
  • when design or as-built documentation is missing, incomplete or inconsistent with the facility;
  • before reconstruction, roof works, installation of solar panels, HVAC units, antennas or other rooftop equipment;
  • after a lightning strike, fire, flooding, mechanical damage or unauthorized alteration;
  • during a technical audit, purchase, lease or commissioning of a facility;
  • when there are doubts about the protection zone, materials, joints, earthing arrangement or surge protective devices;
  • before preparing a repair, modernization or new design scope.

What we check

1. Documentation

  • the design basis and the specified lightning protection class or level;
  • drawings, calculations, specifications and equipment data;
  • as-built documents, test reports and previous inspection records;
  • whether the documents correspond to the actual system at the facility.

2. External lightning protection

  • air terminals, masts, mesh conductors and their positioning;
  • down-conductor routes, fixings, test joints and accessible connections;
  • protection of rooftop equipment and protruding parts;
  • separation distance where it is applicable and can be assessed;
  • corrosion, mechanical damage and compatibility of connected materials.

3. Earthing and equipotential bonding

  • accessible electrodes, conductors, clamps, connections and test points;
  • visible corrosion, damage, loosened joints and unsafe alterations;
  • connection between the lightning protection system, earthing and equipotential bonding;
  • agreed electrical measurements, if they are included in the scope.

4. Internal lightning and surge protection

If included in the agreed scope, we inspect surge protective devices (SPDs): their types, locations, status indicators, coordination, connection lengths and connection to the earthing system. A visual inspection does not replace electrical testing of equipment that requires special procedures.

How the inspection is carried out

  1. We define the objective. Acceptance, safety audit, damage assessment, modernization or preparation of a repair scope.
  2. We collect available documents. Designs, drawings, reports, specifications and information about changes.
  3. We inspect the facility. Accessible system elements, routes, joints, materials and the actual condition are recorded.
  4. We perform agreed measurements. The set of tests depends on the objective, access and technical feasibility.
  5. We compare and classify findings. The actual condition is compared with the design, applicable requirements and good engineering practice within the agreed scope.
  6. We prepare a report. The report separates observed facts, identified risks and recommended actions.

What the customer receives

  • a description of the inspected system and the limits of the inspection;
  • photographs of significant elements and defects;
  • measurement results, when measurements are included;
  • a list of nonconformities and technical risks;
  • prioritized actions for repair, modernization, additional measurements or design work;
  • practical recommendations for the next step.

How findings are classified

  • Critical: a condition that may create an immediate safety risk or makes a key protective function unreliable; prompt action is recommended.
  • Significant: a defect or inconsistency that should be corrected within a planned period.
  • Recommended improvement: a measure that improves reliability, maintainability or documentation but is not presented as an immediate danger.

The category depends on the actual facility, the function of the element, available evidence and the agreed inspection scope.

Inspection, measurement and maintenance are different services

Inspection answers what is installed, what condition it is in and what should be done. Measurement provides values for specific electrical parameters. Maintenance includes agreed technical work to keep or restore the system's condition. One service may lead to another, but they should not be treated as interchangeable.

For planned service work, see lightning protection and earthing maintenance.

Important limitations

The reliability of conclusions depends on access to system elements, the completeness of documentation and the tests that can safely be performed. Hidden or embedded parts cannot always be fully assessed without opening structures or using additional methods.

If there is no design, the inspection can document the actual arrangement and identify visible risks. However, confirmation of a complete protection zone, lightning protection class or full compliance may require calculations and a separate design. The inspection report clearly states these limits rather than presenting assumptions as verified facts.

Frequently asked questions

Can the report be used when accepting work from a contractor?

It can provide technical evidence about the actual system, visible defects and agreed measurements. Formal acceptance also depends on the contract, design documentation and the customer's acceptance procedure.

Is a design required for the inspection?

A design is highly desirable because it gives a defined basis for comparison. An inspection is still possible without it, but some conclusions may require additional calculations or preparation of a new design.

Are electrical measurements included?

They are included only when agreed in advance. The required measurements depend on the objective, system configuration, access and applicable requirements.

Can you inspect only the roof or only the earthing system?

Yes. A limited inspection is possible, but the report must clearly state the inspected area and what was outside the scope.

Does an inspection automatically confirm that the entire facility complies?

No. Such a conclusion is possible only when the scope, documentation, access, calculations and test results are sufficient. Otherwise, the report records verified findings and the additional steps needed for a complete assessment.

Request an inspection

Send the facility address, purpose of the inspection, available design or reports, approximate roof area and several photographs. We will define the scope, required access, measurements and deliverables before scheduling the visit.

Phone: +421 944 732 937.